It was inserted a new map with overall event location and stages locations in the Locations page.
It was also added in the page General Information the detailed map of the arenas.
segunda-feira, 28 de dezembro de 2009
domingo, 20 de dezembro de 2009
Technical information available on-line
After supervisor approval of the POM courses, the technical information is on-line.
sábado, 5 de dezembro de 2009
Task list distributed
POM direction distributed by each team responsible the document “team task list” where are identified the task each team must execute.
Teams responsible visit the Terrain
POM direction, Technical direction and supervisor, together with each working team responsible visit the POM arenas preparing in detail their assembling and disassembling. Discussion about the location of each sector with respective adjustment to the draft sketch of the arena. Visit to start area, accessibilities, parking and other POM locations.


Terrain work initiated
Visits to the map terrains by the IOF supervisor Bruno Nazário, to check and validate the controls, the control descriptions, approval of new maps and other tasks to assure the event quality giving his support to the organization.
sexta-feira, 4 de dezembro de 2009
Courses approval by supervisor
After weeks analyzing the CONDES files with the courses work for the 4 stages of POM, the IOF Supervisor Bruno Nazário concludes the analysis and gives his approval.